Wheatland, Wyoming


DESCRIPTION

The Columbarium incorporates 60 niches on one side and provides structural support for Wyoming native stone on the back, ends and infill surfaces. Niche covers are Cambrian Black and the capstones are Dakota Mahogany.

Timeless Columbaria carefully installed the columbarium under the low-hanging branches of the tree in less than 1 ½ days. The hand-picked Wyoming native stone will be installed by a local, heritage stone mason at a later time.

OWNER
Town of Wheatland, WY

"Citizen driven projects are often the heart and soul of a community. Such is the case with the columbarium in our small town - Wheatland, Wyoming. Through the work of the Covenant Lutheran Church and members of our community we now have a columbarium which offers families an alternative form of burial. "

"We especially appreciated the committee's efforts in researching companies who provided such a service and, in the end, we were very pleased to work with representatives from Timeless Columbaria out of Pella, Iowa. Ken and his crew were great to work with and provided a beautiful columbarium for our residents to enjoy. Thanks Ken!"

Candy Wright

CLEARK/ TREASURER
Town of Wheatland, WY

 

All Case Studies »

 

THE TIMELESS DIFFERENCE


VIEW ALL VIDEOS »

RECENT NEWS


48-Niche Free-Standing Columbarium Installed at Christ United Methodist Church
Posted by Timeless Columbaria in Blogs & Resources on 1/15/2019
The 48-niche free-standing columbarium was installed in a prominent grassy area next to the entrance of the church. Polished Cambrian Black covers were framed by generous slabs of Dakota Mahogany granite...

Timeless Installs Two New Cambrian Black Granite Columbarium Cabinets for Trinity Lutheran Church
Posted by Timeless Columbaria in Blogs & Resources on 1/15/2019
An existing room in the church facility was converted to a meditation room with two new columbarium cabinets installed flush in a wall. Each cabinet contains 25 niches covered in polished Cambrian Black granite...

TESTIMONIALS

“We were able to install the 24,000 pounds of steel and 11 cabinets onto the pre-placed foundations in less than 7 days. Even though this was a one-of-a-kind custom project, the only modifications we needed to perform were slightly enlarging a few anchor-bolt holes. Otherwise all of the connections were bolted and everything fit together beautifully.”
- Austin Steenhoek,
Installation Superintendent
VIEW FULL CASE STUDY »

COLUMBARIA STYLES

Leave this field empty