Mission, Kansas


DESCRIPTION

An existing room in the church facility was converted to a meditation room with two new columbarium cabinets installed flush in a wall. Each cabinet contains 25 niches covered in polished Cambrian Black granite.

Timeless furnished the cabinets and installed them on schedule in the framed wall. The columbarium wall and the rest of the room were finished beautifully by the church.

OWNER
Trinity Lutheran Church

"Recently, I sent you a couple of pictures of our completed Columbarium. I want to follow up with an e-mail, letting you know just how enjoyable and easy it was, working with you and your company. From concept, to completion, delivery, and installation, everything was flawless, and the final product has brought about numerous compliments. We still have not scheduled a dedication for the room, but when we do I will let you know the date, and we'd love to have you attend, if possible.

Ken, I want you to feel free to allow prospective clients to contact me, and if they desire, visit our Columbarium. It's with the utmost confidence that I can show them your product and recommend your company to them."

Sincerely,

Bill Guerry
Chairman, Columbarium Committee
Trinity Lutheran Church
Mission, Kansas

 

All Case Studies »

THE TIMELESS DIFFERENCE


VIEW ALL VIDEOS »

RECENT NEWS


48-Niche Free-Standing Columbarium Installed at Christ United Methodist Church
Posted by Timeless Columbaria in Blogs & Resources on 1/15/2019
The 48-niche free-standing columbarium was installed in a prominent grassy area next to the entrance of the church. Polished Cambrian Black covers were framed by generous slabs of Dakota Mahogany granite...

Timeless Installs Two New Cambrian Black Granite Columbarium Cabinets for Trinity Lutheran Church
Posted by Timeless Columbaria in Blogs & Resources on 1/15/2019
An existing room in the church facility was converted to a meditation room with two new columbarium cabinets installed flush in a wall. Each cabinet contains 25 niches covered in polished Cambrian Black granite...

TESTIMONIALS

“We were able to install the 24,000 pounds of steel and 11 cabinets onto the pre-placed foundations in less than 7 days. Even though this was a one-of-a-kind custom project, the only modifications we needed to perform were slightly enlarging a few anchor-bolt holes. Otherwise all of the connections were bolted and everything fit together beautifully.”
- Austin Steenhoek,
Installation Superintendent
VIEW FULL CASE STUDY »